• Zum Seiteninhalt (Accesskey 1)
  • Zur Hauptnavigation (Accesskey 2)
  • Bundesministerium Frauen, Wissenschaft und Forschung
  • Forschungsinfrastruktur-Datenbank
  • Start
  • Search
  • Mapping
    • Statistics by region
    • Cluster
    • Monitoring
    • Gallery
  • About
    • R&D - Institutions
    • Federal Ministry of Women, Science and Research (BMFWF)
    • Austrian Federal Economic Chamber (WKÖ)
    • Federal Ministry of Economy, Energy and Tourism (BMWET)
  • FAQs & Info
    • FAQs
      • Description of the Research Infrastructure
      • Methods & Services for Research Infrastructure
      • Research infrastructure categories
      • Additional Information to research Infrastructure
      • Search Engine
      • Contact
    • Information
      • National Strategy of Research Infrastructure
      • Research infrastructures in the European Union
      • Research infrastructure databases / Research infrastructure networks
      • BMBWF Research Infrastructure Database: Evaluation Study 2022
      • Awards and press releases
  • Registrieren
  • Login
  • DE
  • EN
Core facility (CF)

Battery Systems Lab

  • To Overview
  • »
  • 28 / 43
  • »

AIT Austrian Institute of Technology GmbH

Wien | Website

Open for Collaboration

Short Description

AIT is a frontrunner in the field of battery storage systems, with key competences ranging from battery cell development to power system integration. The profound expertise is complemented with state-of-the-art battery testing laboratories to support customers throughout the entire procurement process as an independent partner.

TECHNICAL SYSTEM SPECIFICATION
Our experts translate the customer’s functional requirements into precise specifications on a component or system level, including:
• Necessary functional requirements to provide the specified functionalities
• Operational parameters and requirements, taking into account all relevant system variables
• Specifications concerning safety aspects and system operation reliability aspects
All requirements are mapped against existing standards to allow the validation of the specifications during acceptance tests.

ACCEPTANCE TESTING
To validate the defined specifications, AIT offers comprehensive testing, including:
• Factory acceptance testing and witness testing of single components and the complete system using calibrated measurement equipment
• Comprehensive laboratory assessment of performance, aging, safety aspects and environmental influences
• Commissioning witness testing for the validation of system functionality in the field

Contact Person

DI Antony Zegers

Research Services

System design and development for stationary storage at component and system level including simulation and rapid prototyping approaches.

POWER CONVERSION SYSTEM
•Rapid prototyping of power electronics components using hardware-in-the-loop methods
•Control design and control implementation
•Advanced converter topologies and functions for smart grids
•Converter design and development from concept to product level
•Assessment of converter robustness and reliability

ICT & CONTROLS
•Control design, testing and implementation
•Device interoperability and communication path integration testing
•Field monitoring of controller prototypes

STORAGE SYSTEM
•System integration simulation using state-of-the-art grid simulation approaches such as DigSilent PowerFactory, Neplan and others
•Evaluation of component interaction based on laboratory assessment with hardware-in-the-loop approaches

Methods & Expertise for Research Infrastructure

POWER CONVERSION SYSTEM
• Grid integration testing according to national and international standards:
VDE AR N 4105, VDE 0124-100, VDE 0126-1-1, EN 50438, EN 50549-1/2, BDEW, FGW TR3, CEI0-21 & CEI0-16
• Performance testing according to EN50530 & EN61683
• EMC testing, immunity testing, safety testing and fault analysis of relevant power conversion system components

ICT & CONTROLS
• ICT interoperability testing (e.g. on SunSpec compliance)
• End-to-end functionality tests from communication interface to power interface
• Integration tests with external third-party devices such as sensors, PV systems & grid operator gateways

STORAGE SYSTEM
• Comprehensive performance evaluation of the complete storage system including system application
• System integration testing including relevant components and services
• Field test monitoring, data analysis and benchmarking

Terms of Use

Die Nutzung ist jeweils zu vereinbaren.

Reference Projects

https://www.ait.ac.at/themen/smart-grids/projects/leafs/

Contact

DI Antony Zegers
Center for Energy
+43 50550 6092
antony.zegers@ait.ac.at
http://www.ait.ac.at

Location

Location on map

Share this entry

  • Facebook
  • X.com
  • Pinterest
  • LinkedIn
  • E-Mail
© 2025 FEDERAL MINISTRY of WOMEN, SCIENCE and RESEARCH
  • Terms of use / General Data Protection Regulation
  • Declaration on accessibility
  • Imprint
  • Data protection settings